10 |
User Guide | Equipment Set Up |
drainage tubes.
7. When satisfied, close the clamps on both
the drainage tubes.
8. Disconnect the syringe with filling tube from
the A&V in-flow port and connect the A&V in-
flow tube from the bag.
9. Disconnect the drainage tube from the
arterial recirculation port and connect the
arterial recirculation tube from the bag.
10. Leave the drainage tube connected to the
drainage port with the clamp open.
11. Ensure all tubes are securely connected to
the dispensing bag as well as to the ports on the
training arm.
12. Ensure that the connections on both sides
of the chosen A&V or Fistula insert are secure.
13. Turn the pulse rate and strength controls
counter-clockwise, so they are set to their
minimum values.
The training arm is completely assembled,
proceed to the “Priming The System” Section to
fill the system.
PRIMING THE SYSTEM
1. Locate the IV filling kit:
•
One syringe with filling tube
•
Two drainage tubes with clamps
2. Connect the two drainage tubes to the
arterial recirculation port and the drainage port
respectively.
3. Open the clamps on both drainage tubes
and place the ends inside a container to drain
the fluids.
4. Fill the syringe with filling tube with the
water or simulated blood.
5. After filling the syringe with the desired fluid,
attach it to the A&V in-flow port and slowly fill
the system.
6. Repeat the previous step several times
until no more air bubbles are released from the
Содержание S402.100
Страница 2: ...2 User Guide Arterial and Venous Training Arm ...
Страница 4: ...4 User Guide Care and Cautions Care and Cautions ...
Страница 6: ...6 User Guide Getting Started Getting Started ...
Страница 8: ...8 User Guide Equipment Set Up Equipment Set Up ...
Страница 12: ...12 User Guide Working with the Simulator Working with the Simulator ...
Страница 17: ... Appendix User Guide 17 Appendix ...