background image

Tail servo and the heading hold gyro setup

1. Install the Gyro and the tail servo.

    
    

2. Connect the tail pushrod to the servo. 
    Make sure the servo arm is 90 degrees 
    to the tail pushrod. The ball link 
    should be set at the second hole on 
    the servo arm (as shown on left).

3. Slide the servo mount and the tail 
    servo along the tail boom until the 
    tail pitch lever is parallel to the 
    tail output shaft or slightly forward.

Important:

Do not touch the 
tail pitch lever 
mount and the 
tail rotor hub. 

4. Set the Gyro  limit properly, make sure the 

    tail pitch yoke do not touch the tail pitch
    lever mount and the tail rotor hub when the
    tail servo moves to the left and the right 
    maximum travel volumn. If the Gyro you used

    do not have the function of Limit  , set the
    function of  ATV / End Point / Travel Adjust
    on transmitter to adjust the proper travel

    volumn of the tail servo.

   
5. If the tail oscillates or wags at less than 60%

    gain,you will need to move the ball link to the 

    hole which is closer to the serve Gyro limit
    properly. The ideal gain  setting is around 70%.

Содержание Hurricane EP200 V2 Series

Страница 1: ...4 Motor 7 4V 11 1V BL Motor KV 4800 NO 203501 5 Battery Li Po 7 4V 11 1V 800mah NO 926080 926081 6 ESC 18A Micro ESC NO 923182 7 Gyro GU210 Heading Hold Gyro NO 924210 for Hurricane200V2 SE or GU365...

Страница 2: ...ad Assembling Main Fram Assembling Double Joints Tail Slider CNC Tail Gear Case Assembling Belt Driven Unit Assembling Shaft Driven Unit Assembling ESC instruction Specifications of Motor and ESC GU 3...

Страница 3: ...4 Servo AIL Servo PIT Servo ELE Heading Hold Gyro GU 210 To Receiver CCPM Swash plate Electronics Installation and Wiring Gyro Socket AIL ELE ESC GYRO Gyro Gain Plug S PIT RUD ESC AIL ELE GYRO Gyro Ga...

Страница 4: ...Do not touch the tail pitch lever mount and the tail rotor hub 4 Set the Gyro limit properly make sure the tail pitch yoke do not touch the tail pitch lever mount and the tail rotor hub when the tail...

Страница 5: ...ive pitch angle is zero at this position Length of each linkage Servo and linkage setting 1 Adjust the length of the control linkages as figure below Make sure that the the servo arms for CCPM swashpl...

Страница 6: ...hovering head speed should be at least 3000rpm This can be checked with a tachometer If the helicopter is unstable in a hover reduce the pitch at this throttle setting to gain more head speed If this...

Страница 7: ...Min Degrees mm Instantaneous RPM Degrees mm RPM Degrees mm Continual RPM IDLE Mode Suggested Flight Time with 7 4v 800 mah battery 4 5 Min Throttle Stick position Pitch Distance S Current Head speed T...

Страница 8: ...1 4X6 M1 4X5 M1 4X6 M2X8 4 M2X2 B1 5X4X1 3 B1 5X4X1 3 PW3X3 7X1 6 203849 203625 W1 4X2 5X0 4 W1 4X2 5X0 4 O ring IMPORTANT Make sure to use the non locktite adhesive or similar material to adhere the...

Страница 9: ...M1 4X5 P1 4X2X3 W1 4X2 5X0 4 B1 5X4X1 2 P1 4X2X9 B8X12X2 5 1 4X6 203591 Main Rotor Head Assembling 2 IMPORTANT Make sure to use the non locktite adhesive or similar material to adhere the screws whil...

Страница 10: ...hesive to adhere both bearings to bearing mounts Parts in Fig 1 are for belt version only Fig 1 Countsunk Washer Belt version Shaft version The length of tail boom which is inserted into the tail gear...

Страница 11: ...2X3 5X12 M2X3 2 M1 4X6 1 4X3 B3X6X2 M2X3 2 203311 203209 203636 3 5X3 5X31 Main Frame Assembling 2 IMPORTANT Make sure to use the non locktite adhesive or similar material to adhere the screws while a...

Страница 12: ...7X2 M1 4X4 M1 4X4 Upper tail pitch lever Vertical IMPORTANT Make sure to use the non locktite adhesive or similar material to adhere the screws while assemble the parts Do not tighten the screws too t...

Страница 13: ...e the long neck pinion gear to the motor shaft Make sure the distance B is correct Distance B Motor can be mounted front or rear IMPORTANT Make sure to use the non locktite adhesive or similar materia...

Страница 14: ...o the boom holder install the Mast collars Mast and Main gear as shown in figure below ttighten the set screws of mast collars make sure to tighten the screw of tail boom holder after the belt tension...

Страница 15: ...s set properly IMPORTANT Make sure to use the non locktite adhesive or similar material to adhere the screws while assemble the parts Use Locktite 609 680 or similar material to adhere the long neck p...

Страница 16: ...n gear onto the driven shaft adjust the gear mesh and tighten the screws of the boom holder Upper pinion 15T for main gear Lower pinion 9T for crown gear The lower pinion must not touch the main gear...

Страница 17: ...he power if you don t need any further settings If you want to skip this section and leave current setting unchanged just keep throttle stick in minimum position and wait the speed controller to enter...

Страница 18: ...Built in BEC Maximum Input 12 6 V Output 5 V 2 A Low Battery Protect 3 1V 2 9V cell Temperature Overload 120 Specifications of BL Motor KV value 4800 Maximum Current Instantaneous 15 A Efficiency 85...

Страница 19: ...in figure above 3 The trimmers and switches of GU 365 Gyro should be aligned with the slots PIT Servo GU 365 FES Gyro Use the magic tape to attach the battery onto battery plate bottom side and it is...

Страница 20: ...ages Equal 0 Pitch degrees Fig 1 1 The main blade is at 0 pitch degrees Fig 1 2 The arm and the ball link of the Upper Swashplate Lock are perpendicular Fig 2 3 The position of upper swashplate lower...

Страница 21: ...FES 3Blade Rotor Head for 100 250 class 3mm Mast FES 4Blade Rotor Head for 100 250 class 3mm Mast FES 4Blade Swashplate Ass y for 100 250 class 3mm Mast FES 5Blade Rotor Head for 100 250 class 3mm Mas...

Страница 22: ...set for 100 250 class 3mm Mast FES 4Blade System full conversion set for 100 250 class 3mm Mast FES 5Blade System full conversion set for 100 250 class 3mm Mast FES 3Blade System full conversion set...

Страница 23: ...Spindle CNC Swashplate Guide Swashplate Guide Landing Gear Skids Pack Titanium anodized Bearings 1 4x4x1 2 x2pcs Bearings 1 4x4x2 x2pcs Flange Bearing 2x5x2 3 x2pcs Bearings 2x5x2 5 x3pcs Guide Wheel...

Страница 24: ...tanium anodized Tail Boom with one bearing Shaft version Titanium anodized Tail Booms Pack for Belt version Black CF Tail Boom for Belt version H200 Tail Boom Support Set Long CNC Universal Battery Pl...

Страница 25: ...00V2 FES Blade Support for H100 H200 Light weight Body Canopy 9g H200 FRP Painted Canopy A Type Mini Spacer Brass Washer Spare Pack Damper Rubbers Pack for canopy Boom Support Pack Tail Servo Mount Se...

Страница 26: ...or for belt version Micro Receiver SRX 6UH 40MHZ BMS 306BB Servo GUEC GU 210 Heading Hold Gyro GUEC GB 080 Li Po Battery 7 4v 800mah GUEC GB 081 Li Po Battery 11 1v 800mah BL Motor 200w 4800kv with 9...

Страница 27: ...0 4 0 4 0 5 0 5 0 5 0 6 0 7 0 6 0 10 0 10 0 10 0 14 0 4 6 Specification of Screws 1 1 M1 4 Machine screws 1 4 Self taping screws 2 0 Self taping screws M2 0 Tiny head machine screws M2 0 Machine scre...

Страница 28: ...200 V2 1...

Отзывы: