
2.0
— 151 —
12 October 2012
Prepare for flight
Flight plan
●
When establishing a wireless link between the GCS and the X100
●
When arming the X100
●
Continuously during flight
1
Monitor the MPBat field:
19.4 Flight plan
19.4.1
Create a project
P
REREQUISITES
●
GCS with Quickfield software installed
●
Internet connection when defining project location online
●
GPS position
Creating a project is typically done in the office.
1
Open Quickfield and click New Project on the opening screen.
Time
Battery voltage
must be above
If not
When establishing a wireless
connection
12.0 V
Replace the battery with a fully
charged one.
When arming the X100
12.0 V
Handle a low battery warning
before launch
During flight
10.2 V
Handle a low battery warning
(10.2 V) during flight
9.6 V
Handle a low battery warning (9.6
V) during flight
Содержание X100UAS
Страница 1: ...X100 SYSTEM MANUAL X100 UAS ...
Страница 2: ......
Страница 13: ...2 0 13 12 October 2012 24 Maintenance 209 24 1 Update the Autopilot settings file 209 ...
Страница 14: ...2 0 14 12 October 2012 ...
Страница 18: ...2 0 18 12 October 2012 Terms and conventions Conversion table ...
Страница 40: ...2 0 40 12 October 2012 X100 parts Check the elevon response ...
Страница 59: ...2 0 59 12 October 2012 8 EBOX 8 1 eBox parts The eBox consists of the following parts A B C E D ...
Страница 61: ...2 0 61 12 October 2012 eBox eBox modes 8 4 eBox modes The X100 eBox can be in one of the following modes ...
Страница 66: ...2 0 66 12 October 2012 eBox Make the X100 exit ERROR mode ...
Страница 70: ...2 0 70 12 October 2012 Antennas Screw the data link antenna on the eBox ...
Страница 90: ...2 0 90 12 October 2012 Launcher Launch the X100 ...
Страница 110: ...2 0 110 12 October 2012 Tracker Track down an X100 ...
Страница 120: ...2 0 120 12 October 2012 Quickfield Create a flight plan ...
Страница 132: ...2 0 132 12 October 2012 Horizon End a flight ...
Страница 136: ...2 0 136 12 October 2012 Datalog Viewer Collect and save the log files ...
Страница 182: ...2 0 182 12 October 2012 During flight Monitor the landing ...
Страница 190: ...2 0 190 12 October 2012 After the flight Clearing the site ...
Страница 208: ...2 0 208 12 October 2012 In case of Sudden weather changes ...