![Gates Underwater Products PMW-200 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/gates-underwater-products/pmw-200/pmw-200_setup-use-and-care-manual_3758077021.webp)
Gates Underwater Products, Inc
13685 Stowe Drive • Poway, CA • 92064 • 858.391.0052 • 800.875.1052 • Fax 858.391.0053
[email protected] • www.GatesHousings.com
03/09/13
21
Align dot or indent on port and
housing.
The seal o-ring should be
inspected and lubricated.
The buffer o-ring does not
require lubrication but it is
OK to do so.
Also be sure the PMW-200 camera is set with Macro Mode ‘ON’ at all times. This also
ensures the best image quality.
Changing Ports
Gates offers several ports for your PMW-200 housing,
which attach with a bayonet-style mount. Port changes are
easy and straightforward:
Removal
. You will see alignment dots on the housing
and on the port. When aligned, the port is fully
engaged and ready for underwater use. Turning the
port 90 degrees or ¼ turn counterclockwise will release
the port, then gently pull the port directly away to
remove it.
Inspect the o-ring
. Before installing a new port, perform an inspection and
lubrication of the sealing o-ring. See the O-ring Care and Maintenance Guide for
specific details.
Installation
. Mounting a different port is directly the opposite: Insert the port into
the front bulkhead of the housing with the alignment dot on the port facing right or
left. You may need to firmly push the port into the bulkhead to fully seat the port.
Then turn the port clockwise until the silver dot on the port aligns with the dot on the
housing. The port has a built in stop to prevent further rotation. Be sure the port is
fully seated and flush with the housing. You should see no gaps between the port
and the housing.