Once the gate is mounted adequately, electrical power is available, and the concrete pad is
poured, you are ready to proceed.
Anchors
You can use the anchors that are provided with the opener, 3 ¾ “anchor bolts (4), anchors,
washers, and nuts. These anchors must be set into the concrete when it is poured, or you
can use wedge anchors (1/4” x 4”).
Operator Base
Mount the gate opener base to the concrete pad. The distance between the gate and the
base should be no more than 2 ½ “ (64mm). Verify that the opener is leveled properly.
Nut and washer
Anchor
Gate operator
Wire
Operator base
Anchor bolt
Conduit
Chain box
Concrete pad
Socket thread cap screw
60
±
10mm
Fig.2
Fig.3 Mounting size
Chain Box
Make sure the ends of the guide chain are out of the chain holes on both sides of the chain
box. Remove the cover and insert the manual release key and turn counter-clockwise to
disengage the clutch. Remove the elastic band from the shaft and line up the key on the shaft
with the sprocket at the chain box. Insert the sprocket from the chain box into the operator
shaft. Place the operator on top of the base and use four socket head cap screws to mount
the chain box in to the base.