75
Step 4 – Empty De-scale Solution
a) Empty water tank, rinse and fill water
tank with clean water. Replace tank
into machine.
b)
Ensure drip tray is empty and
installed into position. Place cloth
on right side of the drip tray to stop
steam escaping.
c) Rotate left screw first, counter-clo-
ckwise until fully open. Water will
begin to flow into drip tray.
d) Repeat with right screw. Steam will
be released from the boiler.
CAUTION HOT STEAM!
e) Close valves when water stops flow-
ing through both outlets. Empty drip
tray and re-assemble onto unit.
CAUTION HOT WATER!
Step 5 – Fill Boilers
Press 1 cup button and the 20 minu-
te timer will begin. Countdown timer
is finished when PLCD leaves BLANK.
(This allows any remaining solution to be
removed from system).
Step 6 – Flush Boilers
a) Empty water tank, rinse and assem-
ble new water filter into tank.
b) Fill water tank with clean water and
replace into machine.
c) Rotate screws counter-clockwise, as
per previous instructions until fully
open. Water will begin to flow into
drip tray.
d) Close valves when water stops flow-
ing through both outlets. Empty drip
tray and re-assemble onto unit.
CAUTION HOT WATER!
e) Press 1 cup button to complete the
de-scale procedure. Machine will
heat up as normal.
Temperature Unit - °C/ºF (SEt)
Temperature Unit will be displayed on
the LCD screen as SEt. Press MENU
Содержание DESIGN ESPRESSO MASCHINE ADVANCED CONTROL
Страница 91: ...91...