DYNAMIC AND CHEMICAL WASHING / FLUSHING:
In the newly established systems, to aviod the
possible substances in the installation (metal
shavings, some oils, residues of construction wastes
etc.) flushing treatment is a mandatory.
Likewise, it is a mandotory to apply the flushing
treatment without water given to the boiler in
conversion of older systems.
The methods of flushing / flushing are described in
detail in the manual GASSERO DYNAMIC AND
CHEMICAL WASHING / FLUSHING.
Neutral-based, non-acidic, non-alkaline registered
products can be used to clean the installation or
keep the water conditions at desired levels. You can
get
information
from
GASSERO
for
cleaner,
preservative or inhibitor type (stopper, preventive)
products or you can contact with SENTINEL or
FERNOX companies.
4.2
HYDRAULIC CONNECTIONS
According to the current legislation; total heating
capacity of the boiler or cascade system must be
calculated to meet the building's heat demand. All
necessary components must be installed and
supplied correctly in the installation in a manner to
perform their duty. Protective and safety devices
must be used in the heating system as described in
the current legislation.
In order to separate the boiler from the
installation, two ball valves should be placed on
the supply and the return lines.
15
WALLCON X-treme 115-125-150
Total Hardness
°d
pH
Iron
(Not Diluted)
Conductivity
STAINLESS EXCHANGER
1,00
7,5-9,5
<10ppm
≤
2000µS/cm
ALUMINUM EXCHANGER
1,00
6,5-8,5
<10ppm
≤
2000µS/cm
Gassero Water Specification