05/29/03
5-1
Section 5
SYSTEM MAINTENANCE COMMANDS
DESCRIPTION
The commands in this section allow you to load or change your system configuration and enter or
display values for various system options.
If you followed the sequence outlined in Getting Started, you have already (with the help of your
ASR) performed the initial loading of these commands. If you haven’t, do so now.
The following section describes each of the system configuration parameters. If you have
additional options on your Series 1000, see the chapters on those options for additional
parameters to the system configuration process.
The commands in this section are:
●
SC
load or change your system configuration
●
PS
print your system configuration parameters
●
LD
load the current date and time
●
PD
print the current date and time
●
SD
load the time for system shutdown and restart
●
PR
print the program’s revision level and date
●
LK
load PIN key
●
LC
print last cards read
●
MO
display one screen at a time
Содержание SERIES 1000
Страница 1: ...SERIES 1000 FUEL MANAGEMENT SYSTEM OPERATION MANUAL FOR CANADA C08948 GASBOY INTERNATIONAL LLC...
Страница 2: ......
Страница 12: ......
Страница 26: ......
Страница 32: ......
Страница 60: ......
Страница 94: ......
Страница 100: ......
Страница 104: ......
Страница 106: ...GASBOY Series 1000 12 2 05 29 03 Example 4 6 14 3 31 4914 23 Example 7 8 86 2 6 14 8 8 1 4 46 58 3 31 6636 8 61 8 8...
Страница 110: ......
Страница 112: ......
Страница 128: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 154: ...GASBOY Series 1000 19 6 05 29 03 Example for LPH 0 23 6 36 787 06 8 8 7 0 6 36 36 2 2 0 04 0 90 8 32 36 2 2 3967 23...
Страница 172: ......
Страница 180: ......
Страница 204: ......
Страница 210: ......
Страница 212: ......
Страница 239: ...Index 05 29 03 Index 7 Z zero pump totalizers 8 11 zero quantity transactions define for pump disable 5 2...
Страница 240: ......