Page vi
G300 Installation Manual – Table of Contents
Revision A
190-00921-01
4-1 GSU 73 Supply Specifications.........................................................................................................4-2
4-2 GSU 73 Environmental Specifications ............................................................................................4-3
4-3 GSU 73 Available Equipment..........................................................................................................4-3
4-4 Contents of P731 Connector Kit (011-01818-00) ............................................................................4-3
4-5 Contents of P732 Connector Kit (011-01818-01) ............................................................................4-4
5-1 GTP 59 Part Number........................................................................................................................5-1
5-2 GTP 59 Outside Air Temperature Kit ..............................................................................................5-1
5-3 Parts Needed for GTP 59 Installation ..............................................................................................5-2
7-1 SL40 Required Equipment ...............................................................................................................7-1
7-2 SL40 Installation Kit, w/Out Connectors (013-00121-20)...............................................................7-1
7-3 SL40 Installation Kit, D-Sub 15 Pin (013-00121-30) ......................................................................7-1
7-4 SL40 Installation Kit, RF Plug (013-00121-40)...............................................................................7-1
7-5 GTX 327 Required Equipment ........................................................................................................7-2
7-6 Contents of GTX 320/327 Connector Kit (011-00651-01) ..............................................................7-2
7-7 Contents of Transponder Back Plate w/Hex Kit (011-00677-01) ....................................................7-2
9-1 Post-Installation
Calibration Procedure Summary ...........................................................................9-4
9-2 Magnetometer
Interference
Test Sequence Example .....................................................................9-23
10-1 GSU 73 AHRS Operating Mode Table..........................................................................................10-3
10-2 GSU 73 AHRS Pitch/Bank Limitations for Cold Start While Airborne ........................................10-3
Содержание G300 for Cessna SkyCatcher
Страница 1: ...190 00921 01 March 2009 Revision A G300 Installation Manual...
Страница 36: ...Page 4 8 G300 Installation Manual GSU 73 Revision A 190 00921 01 This page intentionally left blank...
Страница 44: ...Page 6 4 G300 Installation Manual Antennas Revision A 190 00921 01 This page intentionally left blank...
Страница 94: ...Page 10 12 G300 Installation Manual Troubleshooting Revision A 190 00921 01 This page intentionally left blank...