background image

 

  

All

 

Pro Jam Adjustable Basketball System 

   

 

 

 

Table of Contents

 

Section 

 

 

 

 

 

 

 

 

 

  Page No. 

Introduction ..........................................................................................................................1 

Safety ...................................................................................................................................2 

Specifications .......................................................................................................................3 

Parts Checklist ................................................................................................................. 4-5 

Installation...................................................................................................................... 6-18 

Optional Post and Backboard Padding ........................................................................ 19-20 

 

 

INTRODUCTION

 

Thank you for your purchase of a Gared Sports model All Pro Jam Adjustable Backstop.  To 
ensure that our equipment will provide years of use to you, we are including this installation, 
operation, and maintenance guide.  This guide will provide information on the proper assembly 
and installation methods, operating procedures, and preventative maintenance of your portable 
backstop. 
 
Please note that a Bill of Materials is being included with this guide.  Please check that all of the 
parts called out on the Bill of Materials are present prior to beginning assembly and setup.  
Please do not substitute for factory parts.  Please contact your dealer or Gared or Performance 
Sports Systems customer service department and allow them to determine if substitute parts are 
acceptable. 
 
It is recommended that an individual who has been properly trained perform assembly and set up 
of the backstop.  No one under the age of 18 should attempt assembly or set up of the unit, unless 
properly supervised. 
 

 

To prevent normal wear and tear from shortening the life of the unit, preventative maintenance 
inspections and repairs should be performed at least once per year.  If the units are subject to 
high or unusual usage, inspections should be scheduled to occur more frequently.  If items are 
found to be nonconforming, replacements can be ordered from Gared, Performance Sports 
Systems, or one of our authorized dealers.  When contacting Gared or PSS, please have 
information regarding the dealer/installer who sold the unit, the name of the project, and any 
applicable warranty information. 
 
 
 
 

Содержание GP12A72DM

Страница 1: ...2G72DM GP12A72DM GP12P72DM Installation Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTUR...

Страница 2: ...ase do not substitute for factory parts Please contact your dealer or Gared or Performance Sports Systems customer service department and allow them to determine if substitute parts are acceptable It...

Страница 3: ...the following warnings to prevent possible personal injury and potential damage to the equipment during assembly setup and operation Before proceeding with assembly read all instructions and assembly...

Страница 4: ...All Pro Jam Adjustable Basketball System 3 SPECIFICATIONS MODEL GP10G72DM GP10A72DM GP10P72DM Backboard 1 2 GLASS 3 8 ACRYLIC 1 2 POLYCARB Weight lb kg 503 228 449 204 459 208...

Страница 5: ...DESCRIPTION 1 4 103055665 WASHER FLAT 66 X 1 31 X 06 DELRIN BLK 2 1 123051518 DECAL WARNING GP SERIES 3 1 153055631 BASE HARDWARE KIT W TEMPLATE PL 4 1 451652530 ACUATOR ASSY GP SERIES 5 4 451652565...

Страница 6: ...31 4 453075000 CAP END 1 X 2 TUBE BLK 32 1 453102433 TUBE ARM PIVOT DS 33 6 453102434 FLANGE BUSHING NON METALLIC 16mm 34 2 501 6 16 16 BOLT CARRIAGE 3 8 16 UNC X 1 35 1 502 10 11 160 HEX BOLT 5 8 11...

Страница 7: ...le Wrenches 2 9 16 11 16 15 16 1 1 8 Wrench 3 Phillips Head Screwdriver 4 Electric Drill 5 11 64 Drill Bit 6 Tape Measure 7 Rubber Mallet 8 Shovel 9 Post Hole Digger 10 Carpenter s Level 11 2 Ladders...

Страница 8: ...asketball System 7 Template Plate Assembly Use the illustration below to assemble the template plate and U bolts Step 3 Securely tighten the top nuts against the plate Step 2 Insert the U bolts up thr...

Страница 9: ...All Pro Jam Adjustable Basketball System 8 Use the illustration below to dig and prepare the hole for anchoring the template plate U bolt assembly This hole is designed to use 1 2 yard of concrete...

Страница 10: ...ncrete as shown in the illustration Agitate the Template plate and U bolt assembly repeatedly to eliminate air bubbles in the concrete Make sure the template plate is resting on the level and finished...

Страница 11: ...post over the U bolts as shown below The post is heavy so use at least two people for this operation Be sure that the post is installed with the Actuator Anchor on the side away from the court 4 Secur...

Страница 12: ...See the instructions on the following pages for more detailed information 1 Install 16mm Flanged Bushing 33 into Upper Arm Pivot Lifting Arm Pivot and Actuator Pivot Tubes 32 Bushings are designed to...

Страница 13: ...e Lifting Arm Weldment 26 Install with flange side against Lifting Arm 4 Attached upper end of Actuator 4 to Lifting Arm using Tube 32 and hardware indicated Tube should pass through both the hole in...

Страница 14: ...nd hardware indicated There are different size holes in each end of the arm Use the larger 5 8 diameter hole Allow arms to swing vertically down at this time Prepare Board for Installation 1 Support B...

Страница 15: ...gain access to Goal mounting hardware Attach Goal to front side of Board using 3 8 hardware and instructions provided with goal 3 Attach Upper Board Brackets 30 to the inside of Backboard frame as sh...

Страница 16: ...d on each side of the Lifting Arm rod 2 Lift the Backboard Assembly and hook the Board Mounting Bracket 28 onto the Lifting Arm rod as shown Be sure that the Bushing Flange stays to the inside of the...

Страница 17: ...he Backboard in a vertical position swing the upper arms up to meet the Upper Board Attaching Brackets 30 and attach using 7 16 x 2 Bolts 39 and hardware as indicated 5 Snug all 7 16 Bolts to remove c...

Страница 18: ...t 34 and the 3 8 goal hardware Level board and retighten Whiz Lock Nuts 2 Check the level of the Goal from side to side If adjustments need to be made loosen the 4 3 8 goal nuts Level Goal and retight...

Страница 19: ...f tape mark the location of the lower edge of the rain shield 2 Crank the Goal to the minimum height so that the Lifting Arm rests on the stop Crank clockwise to lower 3 Apply Height Adjusting Decal 2...

Страница 20: ...All Pro Jam Adjustable Basketball System 19 Installing Optional Padding Note The padding options shown below are purchased separately...

Страница 21: ...e Basketball System 20 The following illustration shows how to attach the optional LSCE72 Pro Mold Recreational Backboard Padding if purchased The padding may be attached before or after the backboard...

Страница 22: ...red Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 707 North 2nd Street Noblesville IN 46060 St Louis MO 63102 800 848 8034 800 325 2682 www perfsports com www garedsports co...

Отзывы: