All
Pro Jam Adjustable Basketball System
12
2.
Attach the Lifting Arm, #26, to the Post
Weldment using 5/8 x 13” Bolt, #36,
and hardware indicated. Allow Lifting
Arm to rest on Arm Stop when bolt is
inserted. Tighten Lock Nut to remove
clearance only.
Do not torque
.
3.
Install 5/8” Flanged Bushing, #48, on pin
protruding from each side of the Lifting Arm
Weldment, #26. Install with flange side against
Lifting Arm.
4.
Attached upper end of Actuator, #4, to
Lifting Arm using Tube, #32 and hardware
indicated. Tube should pass through both
the hole in the plastic rain sleeve and the
hole in the Actuator. Tighten Lock Nut to
remove clearance only.
Do not torque
.
5.
Crank the Actuator clockwise to lengthen it
until the crank end can be attached to the
Anchor on the Post using a 5/8 x 5 1/2”
Bolt, #7, and hardware as indicated.
Tighten Lock Nut to remove clearance only.
Do not torque
.