All
Pro Jam Adjustable Basketball System
10
Install Post
1.
Concrete should be cured for 72 hours before starting installation step.
2.
Place (4) ¾” Flat washer on top of the (4) ¾-10 Nut.
3.
Raise and place the main post over the U-bolts as shown below. The post is heavy, so use
at least two people for this operation. Be sure that the post is installed with the Actuator
Anchor on the side away from the court.
4.
Secure post with (4) ¾” Flat Washer, ¾” Lock Washer, and ¾-10 Hex Nut.
5.
If the post is not exactly vertical, adjust the bottom nuts on the base to level. When the
post is vertical, tighten all nuts securely.
ACTUATOR
ANCHOR