All
Pro Jam Adjustable Basketball System
9
Step 3. Set the U-bolt assembly in the concrete as shown in the illustration.
Agitate the Template plate and U-bolt assembly
repeatedly to eliminate air bubbles in the concrete.
Make sure the template plate is resting on the level
and finished concrete. Clean off any concrete from
the template plate and exposed U-bolt threads.