13-25-629 v03 Page 42
All materials used in Gardner Denver compressor units are compatible with
AEON 9000SP Lubricant. Use caution when selecting downstream components
such as air line lubricating bowls, gaskets and valve trim.
AEON 9000SP Synthetic Lubricant is not compatible with low nitrile Buna N or
acrylic paints. AEON 9000SP is compatible with most air system downstream
components.
Safety Sheets (SDS) are available for all AEON lubricants at web address.
www.gardnerdenverproducts.com/downloads.aspx
LUBRICANT CHANGE PROCEDURE
- If upgrading to a different lubricant type (e.g., longer life, higher
temperature, food grade, etc.), following the proceeding steps, Figure 1-3 for hardware details:
1. Be sure the unit is completely off and that no air pressure is in the oil reservoir.
2. Disconnect, tag and lockout the power supply to the starter.
3. Thoroughly drain oil system while hot:
Open the drain valve at the bottom of the oil sump and remove the single drain plug at the bottom
of the oil core tank. Once the oil has been drained, reinstall the drain plug and close the drain
valve.
Remove and drain oil from the oil filter. Reinstall the used filter.
4. Fill the system with a 50 percent charge of the new lubricant:
Start the machine and monitor its operation.
Allow the machine to reach a stable discharge temperature (5-7 min), then shut down.
5. Thoroughly drain oil system.
6. Replace used oil filter and air/oil separator element with new ones.
7. Fill the system with a full charge of the new lubricant.
8. Machine should then be run normally; however, total run time after the initial change-out should be 50
percent of normal anticipated service life of the new lubricant.
Drain all lubricant from the system, change the filter and separator, and replace with a full charge
of the new lubricant.
9
Subsequent lubricant change-
outs should be at normal intervals. See “Oil Change Interval” in this
Section for details.
COLD AMBIENT OPERATION
-
See “Installation for Cold Weather Operation”, Section 2 and
Содержание L4-5C
Страница 24: ...13 25 629 v03 Page 24 FIGURE 4 2 WIRING DIAGRAM 208 230 460V 60 Hz 306ECA546 B Ref Drawing Page 1 of 3...
Страница 25: ...13 25 629 v03 Page 25 FIGURE 4 3 WIRING DIAGRAM 208 230 460V 60 Hz 306ECA546 B Ref Drawing Page 2 of 3...
Страница 26: ...13 25 629 v03 Page 26 FIGURE 4 4 WIRING DIAGRAM 208 230 460V 60 Hz 306ECA546 B Ref Drawing Page 3 of 3...
Страница 27: ...13 25 629 v03 Page 27 FIGURE 4 5 WIRING DIAGRAM 380V 60 Hz 303ECA546 B Ref Drawing Page 1 of 3...
Страница 28: ...13 25 629 v03 Page 28 FIGURE 4 6 WIRING DIAGRAM 380V 60 Hz 303ECA546 B Ref Drawing Page 2 of 3...
Страница 29: ...13 25 629 v03 Page 29 FIGURE 4 7 WIRING DIAGRAM 380V 60 Hz 303ECA546 B Ref Drawing Page 3 of 3...
Страница 30: ...13 25 629 v03 Page 30 FIGURE 4 8 WIRING DIAGRAM 575V 305ECA546 A Ref Drawing Page 1 of 3...
Страница 31: ...13 25 629 v03 Page 31 FIGURE 4 9 WIRING DIAGRAM 575V 305ECA546 A Ref Drawing Page 2 of 3...
Страница 32: ...13 25 629 v03 Page 32 FIGURE 4 10 WIRING DIAGRAM 575V 305ECA546 A Ref Drawing Page 3 of 3...
Страница 33: ...13 25 629 v03 Page 33 Figure 4 11 WIRING DIAGRAM 230V 1 Phase 307ECA546 D Ref Drawing Page 1 of 4...
Страница 34: ...13 25 629 v03 Page 34 Figure 4 12 WIRING DIAGRAM 230V 1 Phase 307ECA546 D Ref Drawing Page 2 of 4...
Страница 35: ...13 25 629 v03 Page 35 Figure 4 13 WIRING DIAGRAM 230V 1 Phase 307ECA546 D Ref Drawing Page 3 of 4...
Страница 36: ...13 25 629 v03 Page 36 Figure 4 14 WIRING DIAGRAM 230V 1 Phase 307ECA546 D Ref Drawing Page 4 of 4...
Страница 39: ...13 25 629 v03 Page 39 Figure 4 15 PIPING AND INSTRUMENTATION ILLUSTRATION 301ECA797 01 Ref Drawing Page 1 of 1...
Страница 61: ...13 25 629 v03 Page 61 Figure 9 5 Compressor Module Hardware...