19
www.gd-elmorietschle.com
© Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
|
Installation
5.5 Filling with lubricating oil
a) Fill the lubricating oil (for suitable types see
"Maintenance") for the gear wheels and oil fill-
ing point (Fig. 3/H) up to the middle of the sight
glasses (Fig. 3/I).
b) Close the oil filling point.
5.6 Connecting the motor
DANgER
Danger of to life if the electrical installation has
not been done professionally!
The electrical installation must only be done by a
qualified electrician observing EN 60204. The op-
erating company has to provide the main switch.
a) The electrical motor data is given on the data
plate (Fig. 3/N, Fig. 5) or on the motor data
plate (Fig. 3/P
1
). The motors comply with DIN
EN 60034 and are in protection class IP 55 and
insulation class F. The appropriate connection
diagram is located in the motor's terminal box
(not for the plug connection version). Compare
the motor data with the data of the existing
mains network (current type, voltage, network
frequency, permitted current value).
b) Connect the motor via the plug connection or
the motor protection circuit breaker (for safety
reasons, a motor protection circuit breaker is
required and the connecting cable must be in-
stalled via a cable fitting to provide strain relief).
We recommend using motor protection circuit
breakers with delayed switch off, depending on
a possible excess current. Temporary excess
current can occur when the machine is started
under cold conditions.
NotiCe
Power supply
The conditions at the place of installation must meet
the technical details on the motor type plate. Without
derating the following conditions are permissible:
•
± 5 % voltage deviation
•
± 2 % frequency deviation
Содержание Elmo Rietschle C-VLR 60
Страница 31: ......