21
www.gd-elmorietschle.com
© Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
|
Commissioning and decommissioning
6.1.1 Checking the rotation direction
The intended direction of rotation of the drive
shaft is shown by the rotary direction arrow
(Fig. 2/O... Fig. 4/O) on the
motor flange.
A) Start the motor briefly (max. two seconds) to
check the direction of rotation. When looking at
the motor blower, it must rotate counter-clock-
wise.
NotiCe
Incorrect direction of rotation
Running in reverse for a long time may damage the
machine.
Use a phase sequence indicator to check the direc-
tion of rotation (
clockwise
).
6.2 Decommissioning/ storing
Stop the machine
a) Switch the machine off.
b) If available close the cut off device in the suction
and pressure pipe.
c) Disconnect the machine from the electricity
source.
d) Depressurise the machine:
Open the pipes slowly.
The pressure reduces slowly.
e) Remove the pipes and hoses.
F) Seal the connections for suction and pressure
nozzles using adhesive foil.
See also Section 3.2.1, Page 11
6.3 Re-commissioning
a) Check the condition
of the machine (cleanliness,
cabling etc.).
For installation see Section 5, Page 17