Installation
5
Installation
5.1 Preparing for installation
Check the following points:
• Machine freely accessible from all sides
• Do not close ventilation grids and holes
• Sufficient room for installing and removing pipes
and for maintenance work, particularly for install-
ing and dismantling the machine
• No external vibration effects
• Do not suck any hot exhaust air from other ma
-
chines into the cooling system
Oil filling point (Fig. 2/H... Fig. 4/H), oil inspection glasses (Fig. 2/I... Fig. 4/I) and oil outlets
(Fig. 2/K... Fig. 4/K) must be readily accessible.
The cooling air inlets (Fig. 2/E... Fig. 4/E) and the cooling air outlets (Fig. 2/F... Fig. 4/F) must be
placed in distance of at least 30 cm to the adjacent walls. Cooling air coming out must not be
sucked in again.
For maintenance work, before the intake filter (Fig. 2/S) and the intake silencer (Fig. 3/S
1
1
)
a minimum distance of 40 cm must be ensured.
5.2 Installation
NotiCe
The machine may only be operated when it is
set up horizontally.
Material damage resulting from the
machine
tipping over and falling.
When installed at more than 1000 m above sea
level a reduction in power is noticeable. In this
case, please contact us.
Polluted intake air
To protect the machine, the user shall install the
appropriate filters on the intake side.
Ensure that the foundation complies with the follow-
ing conditions:
• Even and level
• The bearing surface must be designed to be
able to carry the weight of the machine
It is possible to install the machine on a firm base without anchoring. When installing on a sub-
structure we recommend fixing with flexible buffers.