background image

 

13-25-603    Page 8 

Revision History

 

 

Version 

Date 

Notes 

01 

May 18

th

, 2017 

Added Kit 314ETK6028 for packages with 3 pressure 
transducers. Added information in section 2 for new kit and 
updated the parts lists for both kits.  

02 

April 09

th

, 2018 

Corrected Appendix B to show accurate wiring information for 
RJ45 connection 

 

 

Содержание AirSmart G2

Страница 1: ...13 17 615 Version 02 April 09th 2018 Multi Machine Sequencing AirSmart G2 Controller Compressor Application INSTALLATION MANUAL...

Страница 2: ...3 A full line of factory tested AEON compressor lubricants specifically formulated for use in Gardner Denver compressors 4 Repair and maintenance kits designed with the necessary parts to simplify ser...

Страница 3: ...mical operation and minimum downtime Boxed text formats are used within this manual to alert users of the following conditions Safety Labels are used within this manual and affixed to the appropriate...

Страница 4: ...low level of risk which if not avoided MAY result in a minor or moderate injury Burn Hazard Hot surface PROHIBITION MANDATORY ACTION REQUIREMENTS Do not Operate Compressor with Guard Removed Do Not Li...

Страница 5: ...or air or oil system until the unit is shut down and the air pressure has been relieved Electrical shock can and may be fatal Perform all wiring in accordance with the National Electrical Code NFPA 70...

Страница 6: ...1 Instructions For Ordering Repair Parts 1 Warning Prohibition Mandatory Label Information 2 Safety Precautions 4 List Of Illustrations 6 Parts List 7 Section 1 General Information 9 Section 2 Instal...

Страница 7: ...g Pressure Connections 9 Figure 1 2 Multi Machine Sequencing 10 Figure 2 1 Sequencing Electrical Connections 14 Figure 2 2 Analog Input Mapping 15 Figure 2 3 System Pressure Address 16 Figure 2 4 Chan...

Страница 8: ...ector 8 position 24CA7402 1 Screw terminal RJ 45 connector 8 position 75LM302 2 1 4 20 Hex Self Tapping Screw 1 2 L 24A77 2 Locknut Conduit 24A383 2 O RING Sealing 1 2 KIT 314ETK6028 Package with 3 Pr...

Страница 9: ...May 18th 2017 Added Kit 314ETK6028 for packages with 3 pressure transducers Added information in section 2 for new kit and updated the parts lists for both kits 02 April 09th 2018 Corrected Appendix B...

Страница 10: ...ance level or higher password and navigate to the following path PATH Machine Configuration AirSmart Controller Controller Firmware Version s If the version is less than 1 4 contact Gardner Denver for...

Страница 11: ...are eight user configurable parameters that control sequencing behavior A distributor level or higher password must be entered to view and make changes to these settings Some of these values must be...

Страница 12: ...chine A or 102 hours in this example Lag Start Delay Units Seconds Default Value 10 Seconds The Lag Start Delay sets the amount of time the leader will wait before asking another compressor to come on...

Страница 13: ...G2 controller Connect the red wire to pin 5 on connector P2 and the white wire to pin 6 on connector P2 as shown in Figure 2 1 Sequencing Electrical Connections Do nothing with the black wire When usi...

Страница 14: ...e GDI Part No 97J110 into the RJ 45 splitter 6 Cut the RJ 45 connector off of the opposite end of the installed 100 ft patch cable and neatly route it through the control cabinet to the installed cabl...

Страница 15: ...13 17 615 Page 14 Figure 2 1 Sequencing Electrical Connections...

Страница 16: ...button soft key while at the home screen to enter the settings menu 2 If the distributor level password has not been entered press the unlock button soft key and enter a distributor level or higher p...

Страница 17: ...epted If an invalid value has been entered the numbers will turn RED 11 Exit to the main menu using the back soft key 12 While at the home screen press the stop button to reload I O Mapping to apply t...

Страница 18: ...nter the settings menu 2 If the distributor level password has not been entered press the unlock button soft key and enter a distributor level or higher password using the onscreen number pad 3 Naviga...

Страница 19: ...this connector Figure 2 6 Slide the black plastic body over the cable before beginning Strip 24 26mm of outer sheathing Trim shielding foil leaving 14 16 mm of wire exposed Insert wires following 568...

Страница 20: ...r machine with a new one equipped with the AirSmart G2 controller If Belden 3106A cable is used follow the termination as shown in the illustration below Terminate RS485 GND on terminal 8 RS485 A on t...

Страница 21: ...r wire termination instructions The AirSmart G2 can also interface with the Connect 12 for sequencing operation The Connect 12 controllers interface with compressors using a Modbus RS 485 interface Fo...

Страница 22: ...For additional information contact your local representative or visit www contactgd com compressors 2014 Gardner Denver Inc Printed in U S A...

Отзывы: