15
21
22
23
24
25
Conduit frame adaptor chained to conduit
extension in pull box-- pulling vertically
from underground.
Use boom extension to obtain
extra cable length for splicing
Conduit frame adaptor and power head
assembly chained to conduit (over
extension) pulling down from box on ceiling.
Pulling from 90° connector to obtain
leads long enough to complete
connection in junction box
Conduit frame adaptor and power head
assembly chained separately to conduit,
pulling from a ceiling pull box for
additional cable.
CP1002
CP505
HS8512
CP601
CP505 (3)
CP701
S8512
CP703
CP505 (2)
CP708
CP601
CP505 (3)
CP503
S8512
CP600
CP702
CP707
CP503
Refer to Contents Chart on page 16 for puller set components.