Page 7 – 4301KFBA – 12/09
Fig. 8
Fig. 8a
8.
Open the Closable Link (N) at the top of the Y-chain Assembly (F) and hook it on to the bottom of the
Straight Chain Assembly (M). Lock the Closable Link.
YOU MUST COMPLETELY TIGHTEN AND
SHUT THE LINK.
Repeat for the second chain assembly. See Figures 8 and 8a.
N