![Galvanic Applied Sciences 962-AGX Скачать руководство пользователя страница 84](http://html1.mh-extra.com/html/galvanic-applied-sciences/962-agx/962-agx_operation-manual_3294067084.webp)
Revision 1
84
9/10/2019
8.3 QA Document Package Check List and Requirements
Table 8-1 is completed during the manufacturing process and QA inspection to ensure that
the all relevant operations are performed.
Table 8-1: Document Package Check List
Serial Number: _______________
Description
Initial
Date
Sample System Pressure Checked
Control Cabinet Type Z Purge System Checked
Gas Runs Complete (Calibration Data Sheet)
Temperature Sensor Inputs Checked and Calibrated
Analog Output Calibration Checked
Digital Output Checked
System 24VDC Supply Checked
Span Factor Set
Zero Solenoid Function Checked
Control Cabinet Air Solenoid Function Checked
Operation of Cell Heaters Checked
Cell Pressure Transducer input checked and
calibrated.
Dielectric Strength Test Certificate Completed
Matrix and Cal Documents Completed
CSA Field Certification
Label Number
Содержание 962-AGX
Страница 43: ...Revision 1 43 9 10 2019 Figure 4 13 Network Sub Panel...
Страница 86: ...Revision 1 86 9 10 2019 Figure 9 1 Customer Connections...
Страница 87: ...Revision 1 87 9 10 2019 Figure 9 2 Analyzer Components...
Страница 88: ...Revision 1 88 9 10 2019 Figure 9 3 Inputs and Outputs...
Страница 89: ...Revision 1 89 9 10 2019 Figure 9 4 AC Wiring Overview...
Страница 90: ...Revision 1 90 9 10 2019 Figure 9 5 DC Wiring Overview...