Revision 1
74
9/10/2019
Figure 7-2: Location of On/Off Switch
c) Access the purged control cabinet following proper company and/or regulatory agency
procedures.
d) Lift the fuse terminal tab opening the terminal block and disconnect the UV Lamp Power
Supply fuse. (ACTS:28) or place the UV Lamp power switch to the Off position (see
Figure 7-2 for the location of the switch).
e) Remove the UV Lamp Power Supply cabinet lid by removing the four (4) socket head cap
screws and pulling the cabinet lid towards you.
f) Remove the two (2) plastic hole plugs from the top of the UV Lamp Power Supply to gain
access to the lamp retaining screws.
g) Disconnect the three (3) lamp connection wires from the terminal strip.
Socket Head Cap Screw
Содержание 962-AGX
Страница 43: ...Revision 1 43 9 10 2019 Figure 4 13 Network Sub Panel...
Страница 86: ...Revision 1 86 9 10 2019 Figure 9 1 Customer Connections...
Страница 87: ...Revision 1 87 9 10 2019 Figure 9 2 Analyzer Components...
Страница 88: ...Revision 1 88 9 10 2019 Figure 9 3 Inputs and Outputs...
Страница 89: ...Revision 1 89 9 10 2019 Figure 9 4 AC Wiring Overview...
Страница 90: ...Revision 1 90 9 10 2019 Figure 9 5 DC Wiring Overview...