Revision 4
86
August 02, 2019
f) The system is now pressurized and a leak check should be made using a soap and water
solution (e.g. Snoop
®
). When the system is verified to be leak-tight it can be restarted.
g) Turn the
Sample Inlet
valve (V5) and the
Sample Vent
valve (V3) to the
On
position.
h) Reconnect the fibre optic cables to the cell.
i) Reinstall the cell RTD with the 6-32 x 3/8" screw using a 7/64" ball driver.
j) Replace the oven compartment cover. Ensure that both latches are securely fastened.
k) Close and latch the oven cover.
l) Reconnect the AC Power to the oven heaters by pushing down and snapping closed the
oven heater fuse terminal cover (ACTS:25). The oven cabinet will begin heating to the set
point temperature.
m) Turn the UV Source Lamp on by placing the UV Lamp switch to the
On
position.
n) Close and latch the control cabinet door.
o) Access the
Spectrum
panel and optimize the spectrometer energy level by clicking on the
Optimize Integ. Time
button.
p) Return to the
Analysis 1
panel and perform a Manual Zero by clicking the
Manual Zero
button.
q) Remove the Zero mode by removing the x from the
Back Purge
box.
r) Press the On Line/Off Line switch to place the system
On Line
. The system will
automatically restart itself.
The oven can take up to two (2) hours to reach operating temperature.
While the cell temperature is below the Cell Low Temperature Set-point, the
system will continue to back purge and maintain an Out of Service
indication to the control room. Barring any additional faults, the system will
automatically return to Sample mode when the cell temperature exceeds
the Cell Low Temperature Set-point plus a 3-degree hysteresis constant.
The analyzer can be left unattended at this point and will return to normal
operation on its own.
Содержание 943-TGX
Страница 48: ...Revision 4 48 August 02 2019 Figure 4 13 Network Sub Panel...
Страница 94: ...Revision 4 94 August 02 2019 Figure 9 3 Control Cabinet Detail...
Страница 96: ...Revision 4 96 August 02 2019 Figure 9 5 AC Wiring Diagram...
Страница 97: ...Revision 4 97 August 02 2019 Figure 9 6 DC Signal and Wiring Diagram...
Страница 98: ...Revision 4 98 August 02 2019 This Page Intentionally Blank...