G.S.I DC Installation and Operation Guide
29
Figure 36: Six Day Cycle Setting Example
4.
After setting the desired cycle length, press
to progress to the
next screen, which automatically saves the change.
Setting the Irrigation Start Day and Time
The start day is the number of days between the day you define an
irrigation program (today) and the day the program actually begins
operating. The start time is the time of day the program begins.
To set the start day and time:
1.
From the Main screen, press
until the Start Day screen appears
Figure 37: Start Day Screen Example
The default display is
d 00
which indicates zero days. If you set this
value for the start day, the irrigation program will start on the
current day at the defined start time. If that time has already
Содержание G.S.I DC
Страница 1: ...G S I DC Controller Installation User Guide January 2015...
Страница 42: ...Cat No AT1272...