Setting Up the Starter Kit Board
GS2200M Starter Kit Board Hardware User Guide
Preparing for Starter Kit Board Setup
28
GS2K-SKB-HW-UG-001278, Release 1.0
2.1.1 Site Preparation
The following table (
) summarizes the tasks you need to perform when
preparing to setup your board.
2.1.2 Safety Guidelines and Standards
To ensure that you setup the evaluation board safely, observe the following guidelines:
•
Review the information in
Appendix A GS2200M Starter Kit Board
and observe all safety information and precautions and
warnings provided throughout this manual.
•
Comply with all applicable safety requirements, practices, and standards. Refer to
Appendix A GS2200M Starter Kit Board Specifications, page 37
•
After setting up the board, protect your equipment by using an ESD approved
grounding strap whenever handling board components.
2.1.3 Environmental Requirements
The following Environmental Requirements must be taken into consideration when setting
up the board. Specific details and values for following key environmental requirements are
listed in
.
Table 8 Setup Checklist
Item and/or Task
Notes
Verify that the environmental factors such
as temperature and humidity do not exceed
required tolerances
Plan evaluation board location
Acquire cables
Download product documentation
Содержание GS2200M
Страница 3: ...Release 1 0 11 23 2016 Copyright 2016 GainSpan All rights reserved ...
Страница 4: ......
Страница 5: ...Release 1 0 11 23 2016 Copyright 2016 GainSpan All rights reserved ...
Страница 6: ......
Страница 8: ...GS2200M Starter Kit Board Hardware User Guide 8 GS2K SKB HW UG 001278 Release 1 0 ...