Assembly

Set the damper lid (15) with mortar. 

Level vertically and horizontally. 

Set the damper frame with a thin 

bed of mortar and make sure the 

damper runs freely.

Set the top lid (14) with mortar. 

Level vertically and horizontally.

Lay mortar over the damper and 

the pipeattachment. Set the Leca 

blocks (16) with mortar. The inside 

of the blocks shall be rendered with 

clay mortar (easiest done before 

the assembly).

Top flue connection

Join the two blocks together with 

the heat-resistant silicon or mortar.

Side flue connection

 to an exist-

ing chimney. 

Cut the back of the block for a suit-

able connection.

Содержание G420 Studio2 White

Страница 1: ...asurements 5 Overall installation sequence 6 Assembly 7 17 Tiles and cassette Tiling preparation and assembly 17 18 Tiling plan 19 Cassette installation 20 23 Fan installation 23 Assembly instruction...

Страница 2: ...pliance SHRA fired by solid fuel Type serial no Gabriel Kakelugnar 800 serie G820 G861 Model G820 Str msrum G830 Borgholm G840 Ekeby G855 Kung lv G860 Avanti G861 Avanti Intended use Space heating in...

Страница 3: ...en Important positions areas for sawing and placing of mortar are marked with a pen Control measurement Shows important measurements during assembly Trowel Shows where the clay mortar is placed Render...

Страница 4: ...mm 415 mm min 75 mm 415 mm Base block 680 mm Top connection 2302 mm Rear connection c c 2148 mm Preparations In a corner Against a straight wall In a corner Against a straight wall Combustible wall Co...

Страница 5: ...11 13 13 13 12 12 1 17 shows the numbers of all parts see page 6 Control measurement min 75 mm min 75 mm min 75 mm min 50 mm Body In a corner Against a straight wall Base blok 730 mm Distance to wall...

Страница 6: ...GABRIEL KERAMIK AB 6 STUDIO2 Start A 7 7 6 5 5 4 3 2 1 17 6 15 14 7 7 7 7 7 7 7 10 10 9 8A 8A 8 8 10 10 10 10 13 13 13 12 12 11 Overall installation sequence STUDIO2...

Страница 7: ...ion distance to the wall is kept Level vertically and horizon tally The opening can be directed at right Check the distance to the wall min 75 mm Before starting the assembly make sure that the suppor...

Страница 8: ...orrectly Set the outer block 3 with mortar The opening shall face the 45 marking on the floor step 1 Seal with insulation where indicated Set the outer block 4 with mortar level the soot hole with the...

Страница 9: ...and horizontally Push the firebox block backwards as much as possible Place the insu lation and pull the firebox block back to lock the indsulation Set the second firebox block 8 on top of the first o...

Страница 10: ...aces with a squeezed sponge then brush with a wet radiator brush Set the third firebox block 8A on top of the second one Make sure that no mortar falls between the blocks Level vertically and horizont...

Страница 11: ...between the blocks Level vertically and horizontally Cut off the insulation Before continuing above the firebox opening construct a prop to sup port both the outer ring and the firebox top block as s...

Страница 12: ...hollow space under the outer ring as indicated Carefully centre and set the outer blocks 7 Make sure that the outer block is one step ahead of each inner block set without mortar during the assembly O...

Страница 13: ...oof 11 Level vertically and horizontally Seal with 2 3 mm insulation Set the outer block 7 in mortar Level vertically and horizontally Make sure that no mortar falls between the firebox block and the...

Страница 14: ...13 7 7 20 21 22 Assembly Set the outer block 7 with mortar Level vertically and horizontally Set the flame protection block 13 with mortar Level vertically and horizontally Set the outer block 7 with...

Страница 15: ...be 2 4 mm below the outer block to allow the inner body to expand Smear a small string of mortar on top of the divider block and the flame protection block Fix the insulation in the mortar string The...

Страница 16: ...Set the top lid 14 with mortar Level vertically and horizontally Lay mortar over the damper and the pipeattachment Set the Leca blocks 16 with mortar The inside of the blocks shall be rendered with c...

Страница 17: ...he downside of the top lid when it is installed Top connected chimney Set the top lid 17 with mortar and make sure it is in level with the underlying flue gas hole Side connected chimney Turn the lid...

Страница 18: ...ox 3mm is recommended The tiles are handmade with tolerance and joints could vary accordingly The overall appearance is important We recommend wooden wedges Start tiling from the bottom and the centre...

Страница 19: ...GABRIEL KERAMIK AB STUDIO2 19 Kakelsats Studio2 27 tiles 66cm tiles Granite shelf Decor steel band 50 mm 30 mm Decor steel band Alternative placement Tiling plan...

Страница 20: ...lace the enclosed rockwool sheet Cut out a square hole the same size as the hole in the firebox plate as indicated Fit in the cassette so that the steel flanges round the cassette are inside the tiles...

Страница 21: ...tion Pass the flexible tube through the cassette bottom and fit it over the connecting flange Fasten the flange plate Mount the damper in the bottom of the cassette do not forget the cotter pins Make...

Страница 22: ...at silicon seal Pull out the cassette approx 20 mm and apply silicon just inside the edge around the brass frame then push the cassette back in Even the seal with a wet finger dipping the finger into...

Страница 23: ...ar in as it will restrict the inlet convection air flow to the cassette Press the fan carefully into the pre cut hole in the sealing block Note The fan must be moun ted so that air is sucked into the...

Страница 24: ...esistant material for long lasting heat radiation Fan controlled direct heat through channels in the hot air cassette for efficient heat circulation Connection for combustion air from the outside The...