GABRIEL KERAMIK AB
10 • STUDIO2
508 mm
5
6
8A
9
10
11
Set the outer ring (5) with mortar.
Level vertically and horizontally.
For a better joint, wipe the
contact surfaces with a
squeezed sponge, then
brush with a wet radiator
brush.
Set the third firebox block (8A)
on top of the second one. Make
sure that no mortar falls between
the blocks. Level vertically and
horizontally.
Note! Clean off mortar leftovers.
Plain with a radiator brush.
Assembly
Set the outer ring (6) with mortar.
Check that the height is
within the tolerane (508 mm).