GABRIEL KERAMIK AB
STUDIO2 • 7
1000
1000
710
45
min 75
min 75
400 mm
1
600 mm
1
1
2a
2b
Assembly
Mark on the floor exactly where the
stove is going to be placed. Also
mark the direction of the opening.
The example on the picture shows
45° from existing 90° corner.
In a corner
Set the base block (1) with a 10
mm thick layer of mortar on the
prepared floor. Make sure the
regulation distance to the wall is
kept. Level vertically and horizon-
tally. The opening can be directed
at right.
Check the distance to the
wall (min. 75 mm)
Before starting the assembly,
make sure that the support is
approved according to your
building permit and that it is
in level with the floor.
Against a straight
wall
Set the base block (1) with a 10
mm thick layer of mortar on the
prepared floor. Make sure the regu-
lation distance to the wall is kept.
Level vertically and horizontally,
see figure 1. The opening can be
directed at right.
Check the distance to the
wall (min. 75 mm)