![G. Paniz FTE 120 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/g-paniz/fte-120/fte-120_instruction-manual_555210021.webp)
ELECTRIC TURBO OVEN
FTE 300-240-150-120
After observing recommendations described previously as for proper functioning of the
equipment, it will be ready to be used.
HOW TO PUT YOUR EQUIPMENT INTO OPERATION
Door
Opening:
Should
the
door
remain
open for more than 3 minutes, a message saying
“DOOR”
will
be
displayed
and
a
sound
signal
will
go
off. As
soon
as
the door is closed,
automatic ignition will start again.
Steam:
It can be activated by pressing switch key . Steam will be activated for time
programmed with 10-second intervals between activations.
2
Lamp:
Can be activated by pressing switch key ; once it has been activated light will only
turn off after 8 seconds.
6
Heating:
Whether there is any heating on ( resistance ON), that should be indicated by a
LED flashing next to the upper displays.
8
End of Cooking:
As soon as cooking process is over, the equipment will sound an alarm
and time displays will start flashing. To turn it off, press switch key number .
Note:
Oven
doesn't turn
off by
itself. To turn
the equipment off
after cooking time is over it is
necessary to press
On /Off switch key.
2
Automatic Ignition:
When you press the button On/Off
is pressed, the automatic ignition
process starts, and resistance will turn on automatically;
FUNCTIONING
ELECTRIC TURBO OVEN
FTE 300-240-150-120
3) ELECTRIC CIRCUIT
ATTENTION!
WATER
DEPOSIT
ELETRIC
INSTALLATION
FAN
SOLENOID
VALVE
PIPING
When installing the equipment, electrician should bear in mind the following::
Note:
Grounding wire can be found at the rear side of the switchboard.
1) We recommend using a circuit breaker in accordance with technical specifications.
2) Direction that the motor should turn to move the turbine is counterclockwise, when
facing front of the oven. Should engine start t urning the other way around, it is
necessary to reverse a phase.
2
3) Provide ground wiring for the oven (we recommend using 2.5mm wires). It is the
customer's responsibility if it is not possible to install it.
4) Incorrect installation can cause malfunctioning to your oven.
Connect water supply for steam generation
directly from the water deposit (reservoir) in
order to prevent high pressures from forming,
except for those reservoirs or tanks installed in
very high locations..
Never connect directly to external water utility
supply, because of very high pressure that is
generated.
Observe instructions, once excessive water
may damage the equipment and compromise
useful life of the solenoid valve.
Water supply pressure should range between
0.8 and 2.0 Kgf/cm2
. Above 2.0 Kgf/cm˝ it is
recommended to provide a pressure-reducing
valve.
ATTENTION
GROUNDING WIRE: Installing ground wiring is mandatory for safety matters whatever
voltage of the product. Be careful! Ground wiring should not be connected to neutral wire
of the power supply. neither to water nor gas pipes, etc.
This supporting rack is supplied disassembled
only for models FTE 120 - FTE 150.
In order to assemble it correctly, follow steps
shown in the drawing below:
4) ASSEMBLING THE SUPPORTING RACK
21
18
1) Led output indicator driven warming;
2) Key for activating the steam time;
3) Key Trigger timer;
4) Access key programming;
5) Down key: Decrease the set value;
6) Up key: Increases the value programmed and
activates the lamp at the scheduled time.
7) Indicating the display elapsed time or
the values of programmable parameters.
8) Display indicating the present temperature
the temperature sensor or the mnemonics
programmable parameters.
9) Led output indicator triggered vapor;
10) Led indicator timer fires.
6
1
8
7
10
9
2
3
4
5
Содержание FTE 120
Страница 2: ......