Installation:
Stage 10
Page 14 of 22 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
SPS 800 / 1200 - Sliding Panel System Plasma Advance
Connecting the Mechanism
To connect the three mechanisms together electrically, is very simple.
Each mechanism has a set of wires coming from it. On the ends of
the wires are control box inserts and block connectors.
These wires are marked with a label telling you which set of connec-
tors the block connectors must go to.
The inserts then slide into the slots on the side of the control box.
Control Box
Inserts
Содержание SPS 1200
Страница 22: ......