background image

 

 

 

10 

 

System Components 

 

Carbon Filter Control Valve Features 

Timer Features 

 

 

 

 

 

 
 
 
 
 
 
 
 
Features of the SXT: 

 

 

Power backup that continues to keep time and the passage of days for a minimum of 48 hours 

in the event of power failure. During a power outage, the control goes into a power-saving 

mode. It does not monitor water usage during a power failure, but it does store the days remain-

ing at the time of power failure. 

 

Settings for both valve (basic system) and control type (method used to trigger a regeneration). 

 

Day-of-the-Week controls. 

 

While in service, the display alternates between time of day and days to regeneration. 

 

The Service Icon flashes if a backwash cycle has been queued. 

 

A backwash can be triggered immediately by pressing the Extra Cycle button for five seconds. 

 

The Parameter Display displays the current Cycle Step (BW, RR, etc) during backwash, and the 

data display counts down the time remaining for that cycle step. While the valve is transferring 

to a new cycle step, the display will flash. The parameter display will identify the destination cy-

cle step (BW, RR, etc) and the data display will read "----". Once the valve reaches the cycle 

step, the display will stop flashing and the data display will change to the time remaining. During 

regeneration, the user can force the control to advance to the next cycle step immediately by 

pressing the extra cycle button. 

Installation, Operation and Maintenance Manual 

Oxi-Gen Oxi-2P,3P,4P, 5P & 6P System 

Error/ 
Information 
Icon 

S e r v i c e  
I c o n  

Extra Cycle 

Button 

U p  

B u t t o n  

D o w n  
B u t t o n  

x1000 Indicator 

Flow Indicator 

Parameter 

Data 

PM 

Display 

Display 

Indicator 

Programming 

Icon 

Содержание Oxi-Gen 150-OXi-2P

Страница 1: ...on Sulfur and Manganese Eradication System Oxi Gen 150 OXi 2P Oxi Gen 150 OXi 3P Oxi Gen 150 OXi 4P Oxi Gen 150 OXi 5P Oxi Gen 150 OXi 6P US Water Systems Inc 1209 Country Club Road Indianapolis IN 46...

Страница 2: ...and Valve Installation 8 Carbon Filter Installation Instructions 9 Carbon Filter Valve Features 10 Carbon Filter Valve Features and Programming 12 Carbon Filter Valve Programming 13 Carbon Filter Sta...

Страница 3: ...er of bathrooms 1 Bathroom 5 GPM 2 Bathrooms 8 GPM 3 Bathrooms 10 GPM 4 Bathrooms 12 GPM 5 Bathrooms 15 GPM 6 Bathrooms 20 GPM Hydrogen peroxide or H2O2 is a powerful yet versatile oxidant that is bot...

Страница 4: ...e oxidizes the contaminants and the by product is H2O water This is much safer than using chlorine in that chlorine can cause other problems in the water stream such as chloramines and trihalomethanes...

Страница 5: ...to assure the accuracy of the dosage The Stenner Proportional Injection System can be utilized to inject any number of chemicals including chlorine hydrogen peroxide polyphosphate Rid O Rust and many...

Страница 6: ...5 Secure wall mount bracket to wall studs using the included lag bolts or other suitable hardware Hang panel on to wall mount bracket 6 Glue stubbed cut pipe into slip socket After glue is cured hand...

Страница 7: ...4 Slide roof into pump mounting bracket over motor WARNING When pressurizing the system gradually allow water to flow Shocking the meter by over speeding it with high flow rates can damage the interna...

Страница 8: ...stem 1 Remove the tank from carton 2 Verify the riser is still fully engaged in the Vortech plate 3 Place a piece of duct tape over the riser tube so no media enters the riser while filling 4 Make sur...

Страница 9: ...nimum of 1 2 Backwash flow rates in excess of 7 gpm or length in excess of 20 require 3 4 drain line Commercial drain lines should be the same size as the drain line flow control 4 The inlet on the by...

Страница 10: ...by pressing the Extra Cycle button for five seconds The Parameter Display displays the current Cycle Step BW RR etc during backwash and the data display counts down the time remaining for that cycle...

Страница 11: ...d backwash time when the number of days since the last backwash equals the backwash day override value Day of the Week Control This control regenerates the system on a weekly schedule The schedule is...

Страница 12: ...or do not appear in filter mode Entering Master Programming Mode Set the Time Of Day display to 12 01 P M Press the extra cycle Then press and hold the Up and Down buttons together until the programmi...

Страница 13: ...2 in Service C Unit Capacity Unit Capacity Grains H Feedwater Hardness Hardness of Inlet Water RS Reserve Selection Percentage Safety Factor rc Fixed Reserve Capacity SF Safety Factor Percentage of t...

Страница 14: ...preferably glass should be full of bubbles immediately after the sample is taken If not the installer will adjust the knob to 50 run the water for 10 15 minutes and check again 4 Continue adjusting th...

Страница 15: ...s an indication that the system is being overfed with H2O2 This occurs because after installation the water will become cleaner and the initial dosage of H2O2 may need to be adjusted to compensate for...

Страница 16: ...ter Open blow down valve and flush the filter 3 6 Months N A Injection Panel Pump Tube Inspect pump tube and replace as needed 2 Tube 1 5 Years 411 UCCP202 Injection Panel Duck Bill Check Valve Replac...

Страница 17: ...17 Flow Schematic Installation Operation and Maintenance Manual Oxi Gen Oxi 2P 3P 4P 5P 6P System...

Страница 18: ...ther casualty or if the original serial numbers have been removed Fouling or damage to the resin caused by iron sulfur bacterial iron silt sand tannins or ganics bacteria hot water or chlorine voids t...

Отзывы: