![Furuno RC18 Series Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/furuno/rc18-series/rc18-series_user-manual_2350512021.webp)
5. RC1815/RC1825 Equipment Setup
5-2
5.2 DMC-5 (Optional Equipment)
Refer to the
Operator’s/Installation Manual, DMC-5
5.2.1 General
The setup and testing of the DMC-5 should be completed last. This unit
expects all equipment, in the console, to already be operational.
1) After powering up the DMC-5 for the first time the screen should be as
shown above.
2) Press the
[SET UP]
key, then the
0
key four times.
3) Then press the
[ENT]
key.
5.2.2 VHF Input
1) Press the
[SET UP]
key, then the
4 [VHF]
key.
2) Press the
[SELECT]
to highlight
No.1
, then press the
[ENT]
key.
5.2.3 MF/HF Input
1) The display should appear as shown above, if it does continue to step 2.
If the
Pos:
still shows
NG
, check the DMC-5 wiring and programming
of VHF No.1, which should be mounted in the console.
2) Press the
[SET UP]
key, then the
5 [MF/HF]
key.
3) Press the
[SELECT]
key to highlight
J3E
, then press the
[ENT]
key.
*Watch* Pos: NG 00:00
Manual input ? [ SET UP ] Key
*Watch* Pos: manu 00:00
*Watch* Pos: auto 00:00
VHF
Содержание RC18 Series
Страница 1: ...FURUNO USA A3 GMDSS CONSOLE MODEL RC18xx Series...
Страница 2: ...FURUNO USA IME GMD 40Z...
Страница 9: ...A3 GMDSS Console Mechanical Drawing 2 4...