
2. WIRING
2-2
2.2
Transducer Cable
Separate the transducer cable as far as possible from power cables to prevent inter-
ference to the sonar. Keep the transducer cable away from televisions and monitors
to prevent noise in the cable.
Fabricate the cable as shown in the procedure below, then connect it inside the unit
with a WAGO connector.
1. Fabricate the cable as shown below.
Note:
Keep the recommended lengths to prevent noise in the cable.
2. Remove the outer cover.
3. Unfasten four screws to remove the inner chassis cover.
Unit: mm
Sheath
x9
x9
Shield
Shield
110
6
80
Wrap with vinyl tape (width: 30 mm).
Wrap shield with conductive tape.
Sheath
Wrap shield around sheath.
Содержание DFF-3D
Страница 1: ...MULTI BEAM SONAR DFF 3D OPERATOR S MANUAL www furuno com Model ...
Страница 10: ...SYSTEM CONFIGURATION viii This page is intentionally left blank ...
Страница 14: ...1 INSTALLATION 1 4 Unit of measurement Top millimeter Bottom inch ...
Страница 16: ...1 INSTALLATION 1 6 This page is intentionally left blank ...
Страница 36: ...3 INITIAL SETTINGS 3 10 This page is intentionally left blank ...
Страница 54: ...4 OPERATION 4 18 This page is intentionally left blank ...
Страница 68: ...APPENDIX 4 INSTALLATION OF TRANSDUCER TM54 AP 12 This page is intentionally left blank ...
Страница 71: ...D 1 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI 20 Sep 2016 H MAKI ...
Страница 74: ...INDEX IN 2 Z Zoom display 4 8 ...