![Fukuda FL-286 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/fukuda/fl-286/fl-286_installation-instructions-manual_2344841024.webp)
32
ELECTRICAL AND AIR PIPE LINE CONNECTIONS
■
TIME CHART
PROCESS
ITEM
READY
L.LEAK DETECTION
READY
RDY
DLY
CHG
BAL
EXH
RDY
INPUT
RESET
START
BUBL
P.SW
LMT1
LMT2
CH 1
CH 2
OUTPUT
OK
+NG
-NG
P.NG
RDY
END
ERR
SOL1
SOL2
SOL3
*2
OTHERS
MAIN DISPLAY
GROUP DISPLAY
BUZZER
REMARKS
DLY
TIMER
CHG
TIMER
DLY
TIMER
*
1 This time chart is for the following specifications:
・
Cylinder control by the DLY timer.
・
Upon NG detection in the DET sequence, EXH sequence immediately follows.
*
2 With (
-
) sign in P.NG setting, SOL3 signal continues for a duration indicated by a light gray bar.
With (+) sign in P.NG setting, SOL 3 signal continues for a duration indicated by a light gray and black bar.
ZERO CORRECTION
0.6sec
0.1sec
EXH
TIMER
ZERO CORRECTION
OFF
DIF. PRES
VALUE HOLD
P.SW
Содержание FL-286
Страница 33: ...72 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286 296 0 Series ...
Страница 34: ...73 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286A 286B 296A 296B 0 Series ...
Страница 35: ...74 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286A 286B 296A 296B 2 Series ...