![Fukuda FL-286 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/fukuda/fl-286/fl-286_installation-instructions-manual_2344841020.webp)
28
ELECTRICAL AND AIR PIPE LINE CONNECTIONS
●
CONNECTION WITH THE PLC (PROGRAM LOGIC CONTROLER
RESET 1
START 2
BUBL 3
CH1 5
CH2 6
COM- 9・10
COM O1 17・18
COM O2 23・24
OK 13
+NG 14
-NG 15
P.NG 16
RDY 19
ERR 20
END 21
24V
0V
シーケンサー
●
The load capacity for the relays in tester should be maintained within the specified value
(
AC125V 0.4A
DC30V 0.4A
).
●
To control the work-clamping cylinder by PLC, input a measurement start signal after confirming the clamp of
the work.
●
Preset the Air Leak Tester testing condition to:
・
Set to condition setting status
SET
> >
DISPLAY
For test condition setting procedures details, refer to page 38.
ON
OFF
・
PRESET THE CYLINDER CONTROL METHOD
SWITCH
STATUS
ON
CONTROL BY DLY TIMER
・
PRESET THE PROPERTY OF THE START SIGNAL
SWITCH
STATUS
ON
A PULSE OF
≧
0.5seccond
PLC
Содержание FL-286
Страница 33: ...72 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286 296 0 Series ...
Страница 34: ...73 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286A 286B 296A 296B 0 Series ...
Страница 35: ...74 SUPPLEMENT EXTERNAL DIMENSIONS EXTERNAL DIMENSIONS FL 286A 286B 296A 296B 2 Series ...