7 2 2 Starting-up
• Switching On
(see chapiter "Star-up"
).
OK
Non compliant
Switching On.
Initialisation for a few seconds.
Operation of the pumps.
Outdoor unit starts after 3 mins.
• Heat pump checks
OK
Non compliant
Value
Operation of fan(s), compressor.
Current measurement.
After a few minutes, measurement of air temp. delta.
Check condensation and evaporation pressure/temperature.
After 15 mins of operation.
Primary water temp. delta.
DHW priority (switching of selection valve).
Operation of heating, mixing valve, boiler backup, …
Control settings.
• Room control
(see chapiter "Configuring the room thermostat"
OK
Non compliant
Settings, manipulations, checks.
Setpoint display.
Explanations on use.
Installation and operating manual "1395 - EN"
- 37 -
Control Box