292
Upgrade and Maintenance Manual
RX300
S7
Processors
Ê
"Removing the server cover" on page 72
Ê
"Removing the air duct" on page 73
.c
11.2.3 Installing the processor
11.2.3.1 Opening the load plate of the processor socket
I
This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 495
)
Figure 148: Opening socket release lever 1
Ê
Unlatch the socket release lever marked
Open 1st
by pushing it down and
away from the socket (1).
Ê
The socket release lever will slightly lift up (2).
Содержание PRIMERGY RX300 S7
Страница 6: ...Upgrade and Maintenance Manual RX300 S7 ...
Страница 26: ...26 Upgrade and Maintenance Manual RX300 S7 ...
Страница 30: ...30 Upgrade and Maintenance Manual RX300 S7 Introduction ...
Страница 42: ...42 Upgrade and Maintenance Manual RX300 S7 Before you start ...
Страница 116: ...116 Upgrade and Maintenance Manual RX300 S7 Basic software procedures ...
Страница 136: ...136 Upgrade and Maintenance Manual RX300 S7 Power supply ...
Страница 176: ...176 Upgrade and Maintenance Manual RX300 S7 Hard disk drives solid state drives ...
Страница 186: ...186 Upgrade and Maintenance Manual RX300 S7 System fan ...
Страница 306: ...306 Upgrade and Maintenance Manual RX300 S7 Processors Figure 160 Opening the load plate B Ê Fully open the load plate ...
Страница 317: ...RX300 S7 Upgrade and Maintenance Manual 317 Processors Figure 170 Opening the load plate B Ê Fully open the load plate ...
Страница 334: ...334 Upgrade and Maintenance Manual RX300 S7 Processors ...
Страница 406: ...406 Upgrade and Maintenance Manual RX300 S7 Accessible drives ...
Страница 498: ...498 Upgrade and Maintenance Manual RX300 S7 System board and components ...
Страница 524: ...524 Upgrade and Maintenance Manual RX300 S7 Conversion configurations ...
Страница 560: ...560 Upgrade and Maintenance Manual RX300 S7 Appendix ...