295
PRIMERGY RX300 S3 User’s Guide
Ap
pend
ix
A
B.7
Power Cord Selection
The power cord for this unit has been packed separately and has been selected according to the country
of destination. It must be used to prevent electric shock. Use the following guidelines if it is necessary to
replace the original cord set.
The female receptacle of the cord set must meet CEE-22 requirements (see Figure).
■
For the United States and Canada
Use a UL listed and CSA labeled cord set consisting of a three conductor cord with a maximum length
of 15 feet.
For units which stand on a desk or table, type SVT or SJT cord sets should be used.
For units which stand on the floor, only SJT type cord sets should be used.
The cord set must be selected according to the current rating for your unit.
Please consult the table below for the selection criteria for power cords used in the United States and
Canada.
table: Selection Criteria for Power Cords Used in the United States and Canada
Cord Type
Size of Conductors in Cord
Maximum Current Rating of Unit
SJT
18 AWG
16 AWG
14 AWG
10 Amps
12 Amps
12 Amps
SVT
18 AWG
17 AWG
10 Amps
12 Amps
• Parallel
For units set at 115 V:
Use a parallel blade, grounding type
attachment plug rated 15 A, 125 V.
• Tandem
For units set at 230 V:
Use a tandem blade, grounding type
attachment plug rated 15 A, 250 V.
Содержание Primergy RX300 S3
Страница 40: ...40 Chapter1 Overview ...
Страница 110: ...110 Chapter 3 OS Installation Using ServerStart ...
Страница 134: ...134 Chapter 4 Manual OS Installation ...
Страница 178: ...178 Chapter 6 High Reliability Tools ...
Страница 226: ...226 Chapter 7 Installing Internal Options ...
Страница 252: ...252 Chapter 8 Configuring Hardware and Utilities ...
Страница 308: ...308 Appendix ...