Step
included
Explanation
Server shutdown no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
2.4
Tools you need at hand
When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
Before you start
RX1330 M5
Upgrade and Maintenance Manual
25
Содержание PRIMERGY RX1330 M5
Страница 68: ...Basic hardware procedures 68 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 118: ...Power supply unit PSU 118 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 178: ...Fans 178 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 230: ...Main memory 230 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 256: ...Accessible drives 256 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 282: ...Front panel 282 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 336: ...System board and components 336 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 362: ...Appendix A 362 Upgrade and Maintenance Manual RX1330 M5 ...
Страница 364: ...FUJITSU Server PRIMERGY RX1330 M5 Reference Manual Reference Manual English Cable Plan for September 2021 ...
Страница 388: ...25 RX1330M5 SERIAL ext Cable Plan CA05973 7065 PCIe SLOT2 System Board D3929 SERIAL System Board D3929 SERIAL ...
Страница 390: ...FUJITSU Server PRIMERGY RX1330 M5S Reference Manual Reference Manual English Cable Plan for March 2021 ...
Страница 403: ...14 RX1330M5S SERIAL ext Cable Plan CA05973 7065 PCIe SLOT2 System Board D3929 SERIAL ...
Страница 405: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...