▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.7
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 29
.
▶
Press the On/Off button to start up the server.
▶
Ensure that the power-on indicator is lit green.
Basic hardware procedures
58
Upgrade and Maintenance Manual
RX1330 M4
Содержание PRIMERGY RX1330 M4
Страница 16: ...17 Appendix B 365 17 1 Supplied documents 365 Content Upgrade and Maintenance Manual RX1330 M4 ...
Страница 98: ...Basic software procedures 98 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 176: ...Hard disk drive HDD solid state drive SSD 176 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 364: ...Appendix A 364 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 366: ...FUJITSU Server PRIMERGY RX1330 M4 Reference Manual Reference Manual English Cable Plan for April 2022 ...
Страница 394: ...29 RX1330 M4 Dual microSD 64GB Enterprise Cable Plan C57 System Board ROC USB 1 Dual microSD 64GB Enterprise CON1 ...
Страница 398: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...