Removing and installing Field Replaceable Units involves complex
maintenance procedures on integral server components. Procedures will
require shutting down, opening and disassembling the server.
CAUTION
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians
trained by Fujitsu. Please note that unauthorized interference with the
system will void the warranty and exempt the manufacturer from all
liability.
Components that are handled as Field Replaceable Units
–
CPU (replacement)
–
SAS/SATA HDD backplane
–
SAS expander board
–
PCIe riser card
–
Front panel module
–
Front panel cable
–
System board
–
Trusted Platform Module (TPM)
–
Power distribution board (PDB)
–
Liquid cooling (LC)
–
Non hot-plug PSUs
–
Non hot-plug fan modules
–
Fan cable
–
Mid Plane kit
–
Memory modules (special RX4770 M5 and memory slots from A to M on
bottom system board)
–
M.2 SSDs (special RX4770 M5 and M.2 SSDs with 110 mm length)
Please ask your local Fujitsu service center for more information.
Before you start
24
Upgrade and Maintenance Manual
RX1330 M4
Содержание PRIMERGY RX1330 M4
Страница 16: ...17 Appendix B 365 17 1 Supplied documents 365 Content Upgrade and Maintenance Manual RX1330 M4 ...
Страница 98: ...Basic software procedures 98 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 176: ...Hard disk drive HDD solid state drive SSD 176 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 364: ...Appendix A 364 Upgrade and Maintenance Manual RX1330 M4 ...
Страница 366: ...FUJITSU Server PRIMERGY RX1330 M4 Reference Manual Reference Manual English Cable Plan for April 2022 ...
Страница 394: ...29 RX1330 M4 Dual microSD 64GB Enterprise Cable Plan C57 System Board ROC USB 1 Dual microSD 64GB Enterprise CON1 ...
Страница 398: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...