86
Upgrade and Maintenance Manual
CX400
S1
Power supply
6.4
Replacing the power supply module
V
CAUTION!
●
When replacing a power supply module in a
non-redundant
configuration, the server
must
be switched off first.
●
Replace the power supply module after specifying the one that
breaks down at work by revitalization.
●
Both power supply modules must be of the same type.
6.4.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
6.4.2
Preliminary steps
Perform the following procedures:
Ê
Only when replacing a power supply module in a non-redundant
configuration:
"Shutting down the server node" on page 41
Ê
Check which power supply module is defective.
A power supply module is defective when the indicator on the PSU module
lights up yellow.
I
For more information see section
"Power supply module" on
page 208
.
Customer Replaceable Units (CRU)
Average task duration: 5 minutes
Содержание PRIMERGY CX400 S1
Страница 12: ...12 Bearbeitungsstand Bestellnummer Content ...
Страница 14: ...14 Upgrade and Maintenance Manual CX400 S1 Version history ...
Страница 18: ...18 Upgrade and Maintenance Manual CX400 S1 Introduction ...
Страница 76: ...76 Upgrade and Maintenance Manual CX400 S1 Basic hardware procedures ...
Страница 132: ...132 Upgrade and Maintenance Manual CX400 S1 Hard disk drives solid state drives ...
Страница 194: ...194 Upgrade and Maintenance Manual CX400 S1 Cabling Figure 145 Midplane 1 MB1 2 MB2 3 J14 4 J16 5 MB4 6 MB3 7 J15 8 J13 ...
Страница 196: ...196 Upgrade and Maintenance Manual CX400 S1 Cabling 12 3 Cabling Figure 147 2 5 inch chassis ...
Страница 197: ...CX400 S1 Upgrade and Maintenance Manual 197 Cabling Figure 148 3 5 inch chassis ...
Страница 198: ...198 Upgrade and Maintenance Manual CX400 S1 Cabling ...