48
Upgrade and Maintenance Manual
CX400
S1
Basic hardware procedures
4.4
Removing the server node from the server
enclosure
I
The CX400 S1 system must always run with closed node bays. It is only
allowed to leave a bay open for a limited time in case of repairing a server
node (for example). In this case the node bay must be closed within one
hour. In the meantime all remaining server nodes run in throttling mode
(with reduced performance).
4.4.1
Removing the server node CX250 S1
V
CAUTION!
●
Shut down the server node and disconnect all external cables.
●
Follow the safety instructions in the chapter
"Important information"
on page 31
.
Figure 7: Removing the server node CX250 S1
Ê
Undo the locking mechanism (1) of the release lever and pull the server
node out of the slot (2).
Содержание PRIMERGY CX400 S1
Страница 12: ...12 Bearbeitungsstand Bestellnummer Content ...
Страница 14: ...14 Upgrade and Maintenance Manual CX400 S1 Version history ...
Страница 18: ...18 Upgrade and Maintenance Manual CX400 S1 Introduction ...
Страница 76: ...76 Upgrade and Maintenance Manual CX400 S1 Basic hardware procedures ...
Страница 132: ...132 Upgrade and Maintenance Manual CX400 S1 Hard disk drives solid state drives ...
Страница 194: ...194 Upgrade and Maintenance Manual CX400 S1 Cabling Figure 145 Midplane 1 MB1 2 MB2 3 J14 4 J16 5 MB4 6 MB3 7 J15 8 J13 ...
Страница 196: ...196 Upgrade and Maintenance Manual CX400 S1 Cabling 12 3 Cabling Figure 147 2 5 inch chassis ...
Страница 197: ...CX400 S1 Upgrade and Maintenance Manual 197 Cabling Figure 148 3 5 inch chassis ...
Страница 198: ...198 Upgrade and Maintenance Manual CX400 S1 Cabling ...