BX924 S3
Upgrade and Maintenance Manual
37
Important information
Modules with Electrostatic-Sensitive Devices
Modules with electrostatic-sensitive devices are identified by the following
sticker:
Figure 1: ESD label
When you handle components fitted with ESDs, you must always observe the
following points:
●
Switch off the system and remove the power plugs from the power outlets
before installing or removing components with ESDs.
●
The circuit boards and soldered parts of internal options are exposed and
can be damaged by static electricity. To ensure reliable protection, you must
wear an earthing band on your wrist when working with this type of module
and connect it to an unpainted, non-conducting metal part of the system.
●
Any devices or tools that are used must be free of electrostatic charge.
●
Wear a suitable grounding cable that connects you to the external chassis
of the system unit.
●
Always hold components with ESDs at the edges or at the points marked
green (touch points).
●
Do not touch any connectors or conduction paths on an ESD.
●
Place all the components on a pad which is free of electrostatic charge.
I
For a detailed description of how to handle ESD components, see the
relevant European or international standards (EN 61340-5-1,
ANSI/ESD S20.20).
Содержание PRIMERGY BX924 S3
Страница 6: ...Upgrade and Maintenance Manual BX924 S3 ...
Страница 16: ...16 Upgrade and Maintenance Manual BX924 S3 ...
Страница 20: ...20 Upgrade and Maintenance Manual BX924 S3 Introduction ...
Страница 42: ...42 Upgrade and Maintenance Manual BX924 S3 Important information ...
Страница 68: ...68 Upgrade and Maintenance Manual BX924 S3 Basic hardware procedures ...
Страница 104: ...104 Upgrade and Maintenance Manual BX924 S3 Basic software procedures ...
Страница 180: ...180 Upgrade and Maintenance Manual BX924 S3 Main memory ...
Страница 199: ...BX924 S3 Upgrade and Maintenance Manual 199 Processors Figure 71 Opening the load plate B Ê Fully open the load plate ...
Страница 211: ...BX924 S3 Upgrade and Maintenance Manual 211 Processors Figure 81 Opening the load plate B Ê Fully open the load plate ...
Страница 232: ...232 Upgrade and Maintenance Manual BX924 S3 Processors ...
Страница 278: ...278 Upgrade and Maintenance Manual BX924 S3 System board components ...