19. DEFROST OPERATION CONTROL
1. CONDITION OF STARTING THE DEFROST OPERATION
The defrost operation starts when the outdoor heat exchanger temperature sensor detects
the temperature lower than the values shown in Table 14.
(Table 14 : Condition of starting Defrost Operation)
ASU9 / 12RL
Less than 25 minutes
25 minutes to
4 hours
Does not operate
Compressor operating time
After 4 hours
21°F(- 6°C)
27°F(- 3°C)
2. CONDITION OF THE DEFROST OPERATION COMPLETION
Defrost operation is released when the conditions become as shown in Table 15.
(Table 15 : Defrost Release Condition)
Release Condition
Outdoor heat exchanger temperature sensor value is higher than
61°F(16°C)
or Compressor operation time has passed 15 minutes.
05-14
ASU9 / 12RL
Содержание Inverter Halcyon AOU12RL
Страница 1: ... Manuel d instruction www lutechenergie com ...
Страница 5: ...1 SPECIFICATIONS R410A WALL MOUNTED type INVERTER ...
Страница 8: ...2 DIMENSIONS R410A WALL MOUNTED type INVERTER ...
Страница 10: ...3 REFRIGERANT SYSTEM DIAGRAM R410A WALL MOUNTED type INVERTER ...
Страница 12: ...4 CIRCUIT DIAGRAM R410A WALL MOUNTED type INVERTER ...
Страница 14: ...5 DESCRIPTION OF EACH CONTROL OPERATION R410A WALL MOUNTED type INVERTER ...
Страница 33: ...6 TROUBLE SHOOTING R410A WALL MOUNTED type INVERTER ...
Страница 74: ...8 REPLACEMENT PARTS R410A WALL MOUNTED type INVERTER ...
Страница 82: ...1116 Suenaga Takatsu ku Kawasaki 213 8502 Japan Mar 2009 Printed in Japan ...