Chapter 2 Installing the Tape Library
2.3 Identifying Product Components
FUJITSU Storage ETERNUS LT40 S2/LT60 S2 LTO Library Installing, Starting Up and Maintaining
Copyright 2018 FUJITSU LIMITED
P3AM-5392-07ENZ0
24
2.3
Identifying Product Components
Confirm that you have received the following:
•
Library
•
Power cord
•
Read Me First and Safety Precautions
•
Rack mount kit
-
2 rack mount rails(Left, Right)
-
1 bag of eight round hole rack screws
-
1 bag of eight Square hole rack screws
-
2 guide pulleys
•
Cover eject bar
•
1 cleaning cartridge
2.4
Removing the Shipping Lock
A yellow label with instructions regarding the shipping lock covers the power button, as shown in the
following picture:
Figure 2.3 Instructions for shipping lock
The shipping lock is held in place with a label and is located in the top center of the library. After the shipping
lock is removed, it should be stored on the rear panel right side of the library for future use.
The shipping lock, which prevents the robotic transport mechanism from moving during shipment, must now
be removed before the library is powered on.
Содержание ETERNUS LT40 S2
Страница 2: ...This page is intentionally left blank ...
Страница 110: ......