5.
Monitor
Application
Copyright© 2009-2017 Fujitsu General Limited. All rights reserved.
77
Detail∙Diagram∙specification∙
5-4-2
Refrigerant circuit selection field
Specifies the refrigerant circuit address.
Date setting field
Sets the date of data you want to display at the Schematic screen.
To select the date, select the date from the calendar which appears
by clicking [▼] button.
When the background of Date setting field is pink, the user is edit
-
ing the date and the data displayed at each display is not confirmed. When the date is
confirmed, the field background becomes white. (*1)
Time setting field
Sets the time of data you want to display at the Schematic screen.
When the background of Date setting field is pink, the user is editing the time and the
data displayed at each display is not confirmed. When the time is confirmed, the field
background becomes white. (*1)
OK button
Confirms the date and time set at
and and updates the screen.
button
Displays the data that was acquired one before the currently displayed data.
2(-hour gauge
Selects the date and time you want to display at the Schematic screen or Graph screen
by using 2(-hour gauge.
There are 2 setting methods.
• Date and time setting by probe movement
The date and time are set by moving the probe using the drag and drop of mouse.
• Date and time setting by gauge scroll
The date and time are set by scrolling the gauge using the drag and drop of mouse.
button
Displays the data that was acquired one after the currently displayed data.
Содержание AIRSTAGE UTY-ASGXZ1
Страница 2: ......