FSP HySpirit series User Manual
5
http://www.fsp-group.com.tw/en/product/PVInverter.html
4.
Installation
4-1. Selecting Mounting Location
Consider the following points to install the inverter:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
This inverter might make noises during operation which may be perceived as a nuisance in
a living area.
Install this inverter at eye level in order to allow the readability of LCD display at all times.
For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side
and approx. 50 cm above and below the unit.
Dusty conditions on the unit may impair the performance of this inverter.
The ambient temperature should be between 0°C and 40°C and relative humidity should
be between 5% and 85% to ensure optimal operation.
The recommended installation is vertical adherence.
For proper operation of this inverter, please use appropriate cables for grid connection.
The pollution degree of the inverter is PD2. Select an appropriate mounting location.
Install the solar inverter in a protected area that is dry, free of excessive dust and with
adequate air flow. Do NOT operate it in the place where the temperature and humidity is
beyond the specific limits. (Please check the specs for the limitations.)
The inverter should be installed in the position where the disconnection means is easily
accessible.
This inverter is designed with IP20 protection for indoor applications only.
Regularly clean the fan filter.
4-2. Mounting Unit
Installation to the wall should be fixed with proper screws. After that, the device should be
bolted on securely.
The inverter can only operate in a CLOSED ELECTRICAL OPERATING AREA. Only service personnel
can enter this area.
Fix the unit with four screws.
WARNING!! Remember that this inverter is heavy so please be careful when removing
it from the package.
WARNING!! FIRE HAZARD.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE
ONLY.