62
Start-up
General
The device is started up by pressing the torch trigger (for manual applications).
Prerequisites
The following conditions must be satisfied before the device is started:
-
Welding torch connected
-
Feed rollers inserted
-
Wirespool or basket-type spool with adapter inserted
-
Wire electrode fed in
-
Brake adjusted
-
Feed roller contact pressure set
-
All covers closed, all side panels in place, all protection devices intact and in their
proper place
-
Where applicable, water connections connected
Commissioning
Before proceeding further as described in the "Welding mode" section, the following activ-
ities are required for the "MIG/MAG standard synergic welding" and "MIG/MAG standard
manual welding" processes:
Plug in the mains plug
Turn the mains switch to position "I"
WARNING!
Operating the equipment incorrectly can cause serious injury and
damage. Do not use the functions described until you have thoroughly read and
understood the following documents:
-
these operating instructions
-
all the operating instructions for the system components, especially the safe-
ty rules
1
2
Содержание TransSteel 2500c
Страница 2: ...2...
Страница 4: ...4...
Страница 8: ...8...
Страница 20: ...20...
Страница 21: ...General information...
Страница 22: ......
Страница 29: ...Control elements and connections...
Страница 30: ......
Страница 39: ...Installation and commissioning...
Страница 40: ......
Страница 49: ...49 EN 3 4 3 4 IMPORTANT Tie the phase conductors near the luster terminal using cable ties...
Страница 63: ...Welding...
Страница 64: ......
Страница 77: ...77 EN Number 3 Number 4 Number 5...
Страница 78: ...78...
Страница 79: ...Setup settings...
Страница 80: ......
Страница 93: ...Troubleshooting and maintenance...
Страница 94: ......
Страница 105: ...105 EN Disposal Dispose of in accordance with the applicable national and local regulations...