![Fronius IG-TL 3.0 Скачать руководство пользователя страница 90](http://html1.mh-extra.com/html/fronius/ig-tl-3-0/ig-tl-3-0_operating-instructions-manual_2339183090.webp)
88
Activating solar
module string
monitoring
IMPORTANT
A value > 0 must be entered for both measuring channels in order to activate
solar module string monitoring. For string monitoring, this value should correspond to the
number of solar modules connected per string. The following steps describe how to set the
number of solar module strings connected to measuring channels 1 and 2.
Select the ‘String Monitor’ menu item.
Press the ‘Enter’ key.
The ‘Status’ parameter is displayed.
Use the ‘Up’ and ‘Down’ keys to se-
lect the ‘Config. Channel #1’ parame-
ter.
Press the ‘Enter’ key.
‘Channel #1’ is displayed, the first digit of
the currently set value flashes.
Use the ‘Up’ and ‘Down’ keys to se-
lect a value for the first digit.
Press the ‘Enter’ key.
1
2
3
4
5
6
Содержание IG-TL 3.0
Страница 2: ...0...
Страница 4: ...2...
Страница 14: ...12...
Страница 15: ...General Information...
Страница 16: ......
Страница 23: ...Installation and Startup...
Страница 24: ......
Страница 58: ...56...
Страница 59: ...Operation...
Страница 60: ......
Страница 97: ...Troubleshooting and Maintenance...
Страница 98: ......
Страница 119: ...117 Tightening torque 2 Nm 2 1 5 1 1 1 1 1 1 2 6 1 3 2 ON 7...
Страница 124: ...122...
Страница 125: ...Appendix...
Страница 126: ......
Страница 137: ...135...
Страница 138: ...136...
Страница 139: ...137...